Topics / Water on the land / 05 of 22
0.05 to 0.95
Runoff and infiltration
The range of the runoff coefficient C, from a flat sandy lawn to a downtown roof. Rain on one surface barely reaches the gutter. Rain on the other barely stops.
When rain reaches the ground it has three options: soak in, sit in puddles, or move across the surface. Runoff is what’s left after the first two are satisfied. How much that is depends on the rain, the ground and the state the ground is already in.
Two ways to make runoff
Robert Horton’s 1933 work described the first. If rain falls faster than the soil can take it in, the excess flows over the surface. This infiltration-excess runoff is what you see on bare clay, compacted ground and, in the limit, pavement. Infiltration starts fast into dry soil and slows as the soil wets, approaching a steady rate. In the NRCS soil groupings, sandy group A soils keep taking in more than about 7.6 mm/h when wet, while group D clays can drop below 1.3 mm/h. A thunderstorm putting down 50 mm/h swamps the clay almost at once, and it can beat all but the coarsest sand for a while.
Thomas Dunne and others later showed the second way. In humid, vegetated landscapes the soil may take in all the rain it’s offered, but near streams and in hollows the water table rises to the surface. Then any rain falling on those wet patches runs straight off. This saturation-excess runoff grows and shrinks with the patches, so the contributing area of a basin isn’t fixed. That’s why one storm can give a very different response from a same-size storm a week earlier.
The land use signal
Pave a catchment and three things happen together. Less water soaks in, so the volume goes up. Pipes and gutters replace slow overland paths, so the water arrives sooner. And because the same volume or more now arrives in less time, the peak climbs steeply. Base flow in the stream between storms tends to drop, since less water has entered the ground to feed it. The Stormwater and green infrastructure sheet covers what can be done about it.
The rational method
The oldest engineering estimate of peak flow goes back to Mulvaney in Ireland in 1851 and Kuichling in the US in 1889, and it’s still in use for small sites:
Q = C i A
Q is peak discharge, C a dimensionless runoff coefficient, i the rainfall intensity for a storm as long as the time of concentration, and A the drainage area. In US customary practice, with i in inches per hour and A in acres, Q comes out in cubic feet per second almost exactly (the true conversion factor is 1.008, and people ignore it). In SI units, with i in mm/h and A in hectares:
Q (m³/s) = 0.00278 C i A
The time of concentration is how long water takes to arrive at the outlet from the most distant point. The logic of the method is that a storm of that length is the shortest one that gets the whole area contributing at once, and shorter storms are more intense. So you find the time of concentration, read the intensity for that duration and your chosen return period from a local rainfall table (in the US, NOAA Atlas 14), and multiply.
| Surface | C |
|---|---|
| Roofs | 0.75 to 0.95 |
| Concrete pavement | 0.80 to 0.95 |
| Asphalt pavement | 0.70 to 0.95 |
| Downtown commercial area | 0.70 to 0.95 |
| Single-family residential | 0.30 to 0.50 |
| Lawn, sandy soil, flat | 0.05 to 0.10 |
| Lawn, heavy soil, steep | 0.25 to 0.35 |
The method has known limits. It treats rain as uniform in space and time, gives only a peak with no hydrograph, and assumes a fixed fraction of rain runs off regardless of how wet the ground is. Manuals generally restrict it to areas below about 80 ha (200 acres), and many jurisdictions set their own limit. For anything bigger, engineers use a unit hydrograph or a computer model. The runoff tool on this site does the arithmetic for learning and rough sketches, not for design.
The curve number
For storm volume instead of peak, the common US approach is the NRCS curve number, from Technical Release 55. A curve number CN between about 30 and 100 captures soil group and land cover. With rainfall P and runoff Q in inches, the potential retention is S = 1000/CN − 10, and Q = (P − 0.2S)2 ÷ (P + 0.8S) for any P above 0.2S. The 0.2S term is the initial abstraction: rain that gets intercepted, ponded or absorbed before anything runs off.
Worked calculation Peak flow from a two-hectare site, before and after
A 2 ha field is to be paved and built on. Rainfall intensity for the site’s time of concentration: 50 mm/h (assumed for this example). C goes from 0.20 to 0.85.
| Before | 0.00278 × 0.20 × 50 × 2 = 0.056 m³/s |
|---|---|
| After | 0.00278 × 0.85 × 50 × 2 = 0.236 m³/s |
| Peak flow rises by | a factor of 4.25, to 236 L/s |
In fact the rise is larger than that, because the paved site’s time of concentration is shorter, and a shorter duration means a higher design intensity. Keeping i at 50 mm/h flatters the developed case.
Worked calculation Storm volume by curve number
3.0 inches of rain falls on an area with CN = 80.
| Retention | S = 1000/80 − 10 = 2.5 in |
|---|---|
| Initial abstraction | 0.2 × 2.5 = 0.5 in |
| Runoff | Q = (3.0 − 0.5)2 ÷ (3.0 + 0.8 × 2.5) = 6.25 ÷ 5.0 |
| Runoff depth | 1.25 in (32 mm), 42% of the rain |
Where to check this
- Chow, V. T., Maidment, D. R., and Mays, L. W. (1988). Applied Hydrology. McGraw-Hill.
- Dunne, T., and Leopold, L. B. (1978). Water in Environmental Planning. W. H. Freeman.
- US Department of Agriculture, Soil Conservation Service (1986). Urban Hydrology for Small Watersheds. Technical Release 55.
- Horton, R. E. (1933). “The role of infiltration in the hydrologic cycle.” Transactions, American Geophysical Union 14.
- Dunne, T., and Black, R. D. (1970). “Partial area contributions to storm runoff in a small New England watershed.” Water Resources Research 6.
Full list on the sources page.